Opportunity Watch · Indian Defence Manufacturing

Verified openings for Indian industry

Each week the Vayuantriksh Opportunity Desk picks out the developments in Indian defence manufacturing that open real business for start-ups, manufacturers entering defence and MSME suppliers. Every item is checked against an official source and says what it means for you.

Vayuantriksh Opportunity DeskUpdated weekly · last update 13 live items
I am a
Policy watch ✓ Verified 26 Oct 2026 Signed 21 Oct 2026 Contracts

A ₹770 crore Army radar order for small drones and aircraft will need sub-suppliers

Signed 21 October 2026; quantity and delivery schedule not published

On 21 October 2026 the Ministry of Defence signed a contract worth nearly ₹770 crore with Bharat Electronics Limited for the Improved Low Level Light Weight Radar (LLLR-I) for the Indian Army. The Ministry says the radar detects and tracks fighter-sized aerial targets and mini and micro drones, and can prioritise aerial targets to help the Army counter unmanned aerial threats. No unit quantity or delivery schedule has been published.

For defence start-ups

Radars that must find mini and micro drones depend on signal processing, tracking software and test tools. If you work in any of these, a funded Army programme with a named prime shows who your likely customer is.

For manufacturers entering defence

If you build precision mechanical structures, enclosures, power electronics or cabling to a controlled standard, a radar order of this size gives the prime a reason to widen its qualified supplier list over time.

For MSME suppliers to DPSUs

BEL buys from vendors it has registered and approved. A new order does not open the door by itself, but it is the right moment to be registered and to know which parts BEL tends to source outside.

The contract is public. How BEL's vendor registration and item-level approval actually work for a small firm, and how to prepare before sub-supply enquiries start, is what we cover with you.

Check my fit →
Policy watch ✓ Verified 26 Oct 2026 Reported 13 Oct 2026 Foreign OEM sourcing

Safran is moving more aircraft and engine parts to Indian suppliers, and the gate is certification

Reported 13 and 15 October 2026; qualification still to be completed

Aequs has widened its supply agreements with Safran to cover six Safran entities, for superalloy machining and landing-gear parts on Airbus A320, A330 and A350 and Boeing 787 aircraft, with a substantial share planned at a new engine-components facility in Tamil Nadu that is not yet operational. Separately, Aerolloy Technologies, a PTC Industries subsidiary, received its second development order from Safran Aircraft Engines for fully machined titanium castings for the LEAP engine, with an MoU on a possible long-term production framework that depends on completing development and qualification. No contract values were disclosed in either case.

For defence start-ups

Safran's orders are for qualified production suppliers, not for ideas, so this is a signal of where aerospace volume is heading rather than a door open to a new entrant. If you make a specialised aerospace process or part, it shows what a foreign OEM expects to see before it places development work.

For manufacturers entering defence

If you machine, cast or finish to aerospace quality for non-defence customers, these orders show a foreign engine and systems OEM sourcing the same kinds of parts from Indian firms. Your existing precision base is an asset, and the certifications are the gap to plan for.

For MSME suppliers to DPSUs

Two Indian suppliers, one in machining and landing-gear parts and one in titanium castings, have each moved from a first relationship to a wider commitment. Smaller firms that supply them with materials, tooling, heat treatment or finishing can become part of the same qualified chain.

The announcements are public. Which approvals a foreign OEM will insist on before development turns into serial supply, how to sequence them for a small plant, and what to put in front of a tier-1 supplier first is what we work through with you.

Plan my certification →
Upcoming ✓ Verified 19 Oct 2026 Approved 25 Aug 2026 Technology transfer

DRDO's conventional missile technology is now open to Indian industry for production

Approved 25 August 2026; first transfer listings awaited

On 25 August 2026 the Raksha Mantri approved the transfer of DRDO-developed technology for all conventional missile systems to Indian industry, for production in India subject to the applicable qualifications, certifications and regulatory requirements. The stated aim is to bring Indian MSMEs and other technology partners into the missile supply chain. No official list of systems or exclusions has been published yet; press reports suggest strategic missiles such as Agni and BrahMos are not covered.

For defence start-ups

Missile programmes need seekers, guidance electronics, telemetry, test equipment and software. If your technology fits one of these, a production partner now has a route to DRDO designs, and you can be part of that team.

For manufacturers entering defence

Missile production is precision machining, composite and metal structures, harnesses, enclosures and assembly. If you already work to tight tolerances and documented processes, this is a defence market that was closed to private firms until now.

For MSME suppliers to DPSUs

The stated aim is to bring MSMEs and other technology partners into the supply chain. As transfers are taken up, the firms that win them will need qualified Indian sub-suppliers for parts and sub-assemblies.

The approval is public. Which systems will be offered, what a licensee must show to qualify, and how a smaller firm fits into a licensee's supply chain is what we work through with you.

Check my fit →
Open ✓ Verified 19 Oct 2026 Reported 18 Aug 2026 Indigenisation

Over 15,700 defence items have been made in India through Srijan, and more are listed

Standing portal; new items added as DPSUs and the Services list them

The Department of Defence Production's indigenisation effort, run through the Srijan portal since August 2020, has seen over 15,700 defence items indigenised in the last five years, replacing an estimated ₹9,000 crore of imports, as reported with the sixth Positive Indigenisation List in August 2026. On Srijan, the defence PSUs and Service headquarters list the items they want made in India; registration is free, and the list keeps changing as new items are added.

For defence start-ups

Srijan lists items the DPSUs and Services want made in India, with the buyer named. It is a free way to find a first customer whose need is already written down.

For manufacturers entering defence

Each listing is a specific part with a buyer behind it. Matching your existing processes against the list is the quickest way to see where your shop floor already fits defence.

For MSME suppliers to DPSUs

Registration is free and the list changes. Firms that check it weekly and respond early are the ones that get to development orders first.

The portal is open to anyone. Picking the items you can realistically qualify for, and preparing what the DPSU will ask for before it places a development order, is where we help.

Find my items →
Policy watch ✓ Verified 12 Oct 2026 Stated 9 Oct 2026 Market direction

The government wants private industry's share of defence production doubled, from 24 to 50 per cent

Raksha Mantri's stated aim, 9 October 2026; not a notified policy target

At the SIDM Champion Awards on 9 October 2026, Raksha Mantri Rajnath Singh repeated his call to raise the private sector's share of India's defence production from about 24 per cent to 50 per cent, and urged industry to invest in R&D and in surge production capacity. It is a stated aim, not a notified target. The money behind it is growing: in FY 2025-26 the Ministry of Defence spent its full ₹1.86 lakh crore capital budget, approved 109 proposals worth ₹6.81 lakh crore and signed contracts worth ₹2.28 lakh crore, while the 16 defence PSUs grew turnover to ₹1.29 lakh crore.

For defence start-ups

Spending is growing and the minister wants more of it to reach private firms. Investors and lead contractors read signals like this; it strengthens the case for a defence product with a clear Indian buyer.

For manufacturers entering defence

Contracts signed in one year reached ₹2.28 lakh crore and approvals ₹6.81 lakh crore. If you have been weighing a move into defence, the direction of policy and money is in your favour.

For MSME suppliers to DPSUs

The defence PSUs grew their turnover 15.4 per cent last year and their exports 151.2 per cent. Growing primes buy more from Indian suppliers, and the push for private capacity widens that chain.

The numbers say where the money is going. Which part of it a company of your size can realistically win, and in what order to go after it, is the conversation to have.

Talk it through →
Upcoming ✓ Verified 12 Oct 2026 RFI dated 25 Sept 2026 Counter-drone

The Army wants steel mesh shields to stop drones over its Western Front installations

RFI dated 25 September 2026 (as reported); response deadline not published; an RFP would follow

Several defence outlets report that the Indian Army has issued a Request for Information, dated 25 September 2026, for steel mesh screens to protect field buildings and sensitive installations on the Western Front. Each screen is about 37 metres by 20 metres, built from three spaced layers of steel mesh that catch an incoming drone, absorb its energy and stop it before it reaches the building, with camouflage so the site stays hard to spot. Reporting links the requirement to 863 drone intrusions recorded along the India-Pakistan border in the Ministry of Defence annual report for 2025-26. We have not seen the RFI itself, and no response deadline has been published.

For defence start-ups

The mesh is the passive last layer behind radar, jammers and guns. If you work on camouflage coatings, signature reduction or impact sensing, this is a named requirement that needs exactly that.

For manufacturers entering defence

Three layers of steel mesh over a frame about 37 by 20 metres is structural fabrication and wire-mesh work. If you build sheds, steel structures or mesh products, this is a defence use for skills you already have.

For MSME suppliers to DPSUs

The screens will be needed at several sites, each installed and camouflaged on location. Local fabrication, galvanising, coating and erection capacity near the Western Sector will matter.

The requirement is reported above. Reading the RFI properly, showing that your mesh and coating actually stop and absorb a drone, and getting onto the Army's vendor list before the RFP is what we help with.

Check my fit →
Upcoming ✓ Verified 12 Oct 2026 Contract signed 13 Apr 2026 Maintenance and repair

Tejas engines will now be repaired in India, at an IAF depot set up with GE Aerospace

Contract signed 13 April 2026; depot being set up

GE Aerospace signed a contract with the Indian Air Force on 13 April 2026 to help set up a depot in India for the F404-IN20 engines that power the Tejas Light Combat Aircraft fleet. The depot will be owned, operated and maintained by the IAF, with GE providing technical inputs, training, support staff, spares and specialised equipment. The aim is to repair and overhaul these engines at home instead of sending them to overseas repair centres, shortening turnaround times.

For defence start-ups

An engine depot runs on inspection, diagnostics and records. If you build condition monitoring, inspection tools or maintenance software, an IAF engine shop in India is a customer that did not exist before.

For manufacturers entering defence

Overhaul work needs precision machining, fixtures, tooling, test rigs and clean handling facilities. If you serve aero or automotive engine makers today, this is a defence application for the same discipline.

For MSME suppliers to DPSUs

Spares and specialised equipment come from GE at first; the case for Indian sources for consumables, fixtures and support services grows as the depot builds up its workload.

The contract is public. Which depot needs an Indian supplier can meet, and the quality approvals you would need before the IAF or GE will buy, is what we work through with you.

Ask the Opportunity Desk →
Open ✓ Verified 5 Oct 2026 Reported 25 Sept 2026 Naval programmes

The Navy wants an Indian-designed harbour defence system for four major bases

Response deadline not reported

The Indian Navy has issued a Request for Proposal for an Indigenous Harbour Defence System covering Mumbai, Karwar, Kochi and Visakhapatnam. As reported, it combines five high-power X-band radars, 13 sonars that detect divers, swimmer delivery vehicles and midget submarines, and five electro-optical and infrared suites, feeding a command and control system that can track more than 600 surface targets and over 50 subsurface tracks at once. It replaces an Israel Aerospace Industries ELTA system first commissioned at Kochi in July 2015. These details come from trade reporting; no response deadline was given and we have not seen the RFP document itself.

For defence start-ups

A system like this rests on radar signal processing, diver-detection sonar, electro-optical analytics and the tracking software above them. If you have one of these working, this is a concrete requirement to test it against.

For manufacturers entering defence

A system spread over four ports needs ruggedised electronics, enclosures, cabling and power at scale. If you already build for harsh outdoor or marine conditions, this is a naval use for that capability.

For MSME suppliers to DPSUs

Installation, integration, testing and upkeep at four ports will need local engineering and fabrication support. Suppliers close to the work may be asked to help the bidders.

What the RFP asks for is above. Whether your product can sit inside a bid, how to put it in front of the right bidder, and what the Navy is likely to test it on is the part we help with.

Check my fit →
Open ✓ Verified 5 Oct 2026 Technology transfer

DRDO is offering the Tejas Mk1A radome design to Indian manufacturers

Standing offer on DRDO's transfer portal, no deadline stated

DRDO's technology-transfer portal carries an offer document for the radome of the Tejas Mk1A, developed by R&DE (Engineers), Pune. It is a monolithic composite shell, quartz fibre in a cyanate ester resin, made by resin film infusion. The transfer package covers the bill of materials, manufacturing drawings, composite process details and the quality and acceptance test plans, and applicants file a company assessment form with the lab's director. The document gives no deadline and no fee.

For defence start-ups

If you have composites skills, this gives you a design package already developed by a DRDO laboratory instead of a blank sheet, aimed at a platform that is in production.

For manufacturers entering defence

A radome is a high-value specialist composite product with a named aircraft behind it. The document says imported radomes are in use on the aircraft today, which is the gap this offer is meant to close. If you build composite structures for aerospace, marine or industrial use, this is a way to add it.

For MSME suppliers to DPSUs

Lay-up, resin infusion, painting and test work around a radome are jobs a licensee may need to place with suppliers. Composite and finishing shops can position for that early.

The offer says what you receive. Whether your facility, quality system and finances will pass DRDO's assessment, and how to get from a signed licence to a radome that clears acceptance testing, is where firms lose time. Radome development is one of our core areas.

Plan my application →
Upcoming ✓ Verified 2 Oct 2026 Approved 7 Sept 2026 Procurement

₹1,10,000 crore of new defence programmes, about 98 per cent for Indian industry

Stage: approved in principle; requests for proposal to follow

The Defence Acquisition Council has given Acceptance of Necessity to proposals worth about ₹1,10,000 crore, about 98 per cent to be sourced from Indian industry. They include Arudhra radars and marine gas turbines for the Navy; a Ground-Based Multi-Purpose Jammer, a secure access card system and upgrades to fighters, transports and helicopters for the IAF; and CBRN reconnaissance vehicles, high-mobility vehicles, mechanical mine layers, ALH helicopters, trawl tanks and Sarvatra bridges for the Army.

For defence start-ups

Jammer, radar and secure-access programmes all need specialist sub-systems and software. Lead contractors start choosing partners before the request for proposal is out, so this is the window to be noticed.

For manufacturers entering defence

Vehicles, bridges, mine layers and trawls are heavy fabrication and mobility work. Firms from automotive, construction equipment and structural steel have a natural way in.

For MSME suppliers to DPSUs

A 98 per cent Indian share means the lead contractors will need Indian tier-2 and tier-3 suppliers for parts, harnesses, enclosures and assemblies across all these programmes.

Who is likely to lead each programme, and how to get onto their supplier list before the request for proposal, is the conversation to have now.

Ask the Opportunity Desk →
Open ✓ Verified 2 Oct 2026 Announced 18 Aug 2026 Indigenisation

405 more defence items that must now be bought from Indian industry

Timeline: item by item, as stated in the list (rolling)

The Department of Defence Production has notified the sixth Positive Indigenisation List: 405 items (389 for the defence PSUs, 16 for the Indian Coast Guard) worth an estimated ₹3,070 crore. They range from line replaceable units and sub-systems to spares, components and raw materials, for platforms including the Su-30MKI, LCA, ALH and LUH helicopters, AL-31FP engines, armoured vehicles, warships, missiles, and radars, sonars and fire-control systems. After each item's timeline it may be procured only from Indian industry.

For defence start-ups

Radar, sonar and fire-control sub-systems on a notified list mean a buyer who is obliged to source in India. That is a sharper target for a product roadmap, and a stronger story for investors, than "the defence market".

For manufacturers entering defence

Much of the list is spares, components and raw materials: the kind of work casting, forging, machining and electronics shops already do. The question is which items match your processes closely enough to qualify.

For MSME suppliers to DPSUs

The DPSUs now have to find Indian sources for these items on a fixed timeline. Suppliers who are registered, qualified and visible to the right DPSU before that date are the ones who get the orders.

Which of the 405 items fits your shop floor, and what a DPSU will ask for before your first order, is where we start.

Check my fit →
Sources: All India Radio News, 18 August 2026; detailed list on the Srijan Defence portal.
Open ✓ Verified 2 Oct 2026 Released 25 Jul 2026 Certification

Military airworthiness certification, now with a published playbook

Available now from CEMILAC

CEMILAC has released Certification Kit Ver 2.0, with modules on airworthiness certification frameworks, policy documents and tutorial material. New in this version: the Design Organisation Approval Scheme in detail, the e-Certification portal with troubleshooting, an update on Airworthiness Certification Requirements, editable IMTAR forms and FAQs. CEMILAC wants developers to plan for airworthiness before they first approach it, to cut certification delays.

For defence start-ups

If your product flies or goes on something that flies, certification usually takes longer than development. Planning it from the first design review can save a year.

For manufacturers entering defence

A clear, official view of what military airworthiness certification involves, before you commit money to an airborne product line.

For MSME suppliers to DPSUs

Editable forms and the e-Certification portal make the paperwork easier, but the evidence behind it (design data, test results, quality records) still has to be built in.

The kit explains the rules. Turning them into a certification plan for your product, with the right evidence in the right order, is what we do.

Plan my certification →
Policy watch ✓ Verified 2 Oct 2026 Procurement rules

DAP 2026 is still a draft: plan under DAP 2020

Status at 2 October 2026: not notified

The draft Defence Acquisition Procedure 2026 was released for consultation on 10 February 2026 and was meant to take effect from 1 April 2026. As at 2 October 2026 no final version has been notified, so capital acquisition still runs under DAP 2020.

For defence start-ups

Bids and proposals in progress are judged under DAP 2020's categories and indigenous-content rules. Build your plans on those, and treat the draft's changes as possibilities.

For manufacturers entering defence

Do not base an investment case on rules that are still a draft. The rules in force today are the ones that decide eligibility.

For MSME suppliers to DPSUs

Indigenous-content commitments your customers make today are measured under DAP 2020, and that shapes what they need from you.

What changes for your category when DAP 2026 is notified, and what to prepare now, is worth an hour.

Talk it through →
Sources: Ministry of Defence draft DAP 2026 consultation notice, 10 February 2026; IMPRI, 22 September 2026; Opportunity Desk check of PIB and MoD releases, 2 October 2026. See also: our DAP 2020 guide.

Closed and past opportunities

Closed ✓ Verified 26 Oct 2026 Reported 4 Oct 2026 Technology development

DRDO is looking for an Indian maker of radar chips that carry signals as light

Deadline: 19 October 2026 · Responses due 19 October 2026, 5 pm (per the TDF listing)

DRDO's Electronics and Radar Development Establishment (LRDE) in Bengaluru has asked industry for information on an indigenous microwave photonic chip for radar. The device is an eight-channel transceiver covering 0.5 to 40 GHz, so it serves X, Ku, K and Ka band radars, with channel isolation better than 40 dB. The aim is to carry radar signals over optical fibre instead of copper between remote antenna arrays and central processors, which cuts cable weight and improves resistance to electromagnetic interference. Responses go through the Technology Development Fund portal. The submission date of 19 October 2026, 5 pm, comes from the TDF listing. Update on 26 October 2026: the window has closed, no extension was found, and no award, shortlist or follow-on request has been reported. The TDF portal could not be reached to confirm the outcome.

For defence start-ups

This is a call for information on development, not a purchase order. If you work on photonic integrated circuits, microwave photonics or RF over fibre, an RFI is where DRDO learns who can do what, and a response puts you on its list.

For manufacturers entering defence

If you make high-frequency electronics, optical components or precision packaging, a photonic radar link is an adjacent product line with a defence customer already asking for it.

For MSME suppliers to DPSUs

If this matures, fibre links replace coaxial cable between radar antennas and processors. That moves value towards fibre assemblies, connectors and the test equipment to qualify them.

The RFI text is public. What a credible response looks like, how to state your readiness level honestly, and which gaps a DRDO review will probe are not.

Ask about similar openings →

About these items. The Vayuantriksh Opportunity Desk summarises developments from official sources, linked on each item, and checks them on the date shown. Summaries are our own words; always confirm details with the issuing authority before acting. This page is general information, not legal, financial or procurement advice.